---
title: "Tepco to resume attempt to probe damaged reactor at Fukushima No. 1 plant"
description: "CBRNe World provides those tasked with defending against CBRN and IED threats with the essential practical, scientific and political information. Access the current and previous issues of the magazine by registering as a member."
url: "https://cbrneworld.com/news/subscribers/tepco-to-resume-attempt-to-probe-damaged-reactor-at-fukushima-no-1-plant"
date: "2026-07-30T21:15:49+00:00"
language: "en-GB"
---

#  Tepco to resume attempt to probe damaged reactor at Fukushima No. 1 plant

 Written by CBRNe World Staff on 16 January 2018.

The device will also measure the temperature and radioactivity levels in the area. The survey is expected to take one day. In January last year, an inserted camera with a limited view captured possible melted fuel in the interior of the No. 2 reactor. The following month, Tepco attempted a survey using a scorpion-shaped robot inside the unit, but the effort ended in failure due to a technical flaw. Nearly seven years after the March 2011 earthquake and tsunami that wrecked the plant, details of the damage to the reactors remain largely unknown due to high levels of radiation.

 [Radiation](https://cbrneworld.com/component/tags/tag/radiation)

## Schema

```json
{ "@context": "https://schema.org", "@type": "BreadcrumbList", "itemListElement": [ { "@type": "ListItem", "position": 1, "name": "News", "item": "https://cbrneworld.com/news" }, { "@type": "ListItem", "position": 2, "name": "Subscribers", "item": "https://cbrneworld.com/news/subscribers" }, { "@type": "ListItem", "position": 3, "name": "Tepco to resume attempt to probe damaged reactor at Fukushima No. 1 plant", "item": "https://cbrneworld.com/news/subscribers/tepco-to-resume-attempt-to-probe-damaged-reactor-at-fukushima-no-1-plant" } ] }
```

```json
{ "@context": "https://schema.org", "@type": "NewsArticle", "mainEntityOfPage": { "@type": "WebPage", "@id": "https://cbrneworld.com/news/subscribers/tepco-to-resume-attempt-to-probe-damaged-reactor-at-fukushima-no-1-plant" }, "headline": "Tepco to resume attempt to probe damaged reactor at Fukushima No. 1 plant", "description": "The operator of the Fukushima No. 1 nuclear power plant has said it will resume late this week a survey of the crippled No. 2 reactor using a telescopic arm, hoping to obtain images of melted nuclear fuel.In Friday’s survey, Tokyo Electric Power Company Holdings Inc. aims to investigate the area beneath the reactor’s pressure vessel, through which nuclear fuel is believed to have melted. The step is needed to help develop a plan for removing the fuel for the ultimate decommissioning of the plant.Tepco, in announcing the move on Monday, said it will insert a 13-meter long pipe at the bottom of the pressure vessel and then deploy a camera at the tip of the pipe to film the bottom of the outer primary containment vessel, where fuel is believed to have accumulated.", "image": { "@type": "ImageObject", "url": "https://cbrneworld.com/" }, "publisher": { "@type": "Organization", "name": "CBRNe World Magazine", "logo": { "@type": "ImageObject", "url": "https://cbrneworld.com/images/default/Asset%201.png" } }, "author": { "@type": "Person", "name": "Ben Bray", "url": "https://cbrneworld.com/news/subscribers/tepco-to-resume-attempt-to-probe-damaged-reactor-at-fukushima-no-1-plant" }, "datePublished": "2018-01-16T11:48:45+00:00", "dateCreated": "2018-01-16T11:48:45+00:00", "dateModified": "2018-12-14T15:55:28+00:00" }
```
